Refurbishments

Blue Wave Refurbishments 1
Blue Wave Refurbishments 12
Blue Wave Refurbishments 9
Blue Wave Refurbishments 8
Blue Wave Refurbishments 7
Blue Wave Refurbishments 6
Blue Wave Refurbishments 5
Blue Wave Refurbishments 4
Blue Wave Refurbishments 3
Blue Wave Refurbishments 2
R

efurbishment work is the bulk of our workload from fitting out new kitchens, bathrooms, to re-decoration, wood flooring, and ceramic tiling to total refurbishments of properties.

We were very privileged recently to undertake the total restoration of the Lodge building on Staplegrove Road in Taunton (formerly the St John’s headquarters). This property is a very substantial Victorian building which was in a very poor condition and had been extended previously using unsympathetic materials.

It was a fantastic challenge to return this grand house and gardens back to their former glory using carefully selected high quality materials.

The design team did a wonderful job designing the new internal layout to make it work for its current owner, including structural alterations with the use of steel

The building was totally stripped back to it shell and new roof coverings and flashings installed, bath stone detailing made good.

Following the alterations internally, a complete new mechanical and electrical systems were installed, the building was re-plastered and fitted out and finished to an extremely high standard.

View our gallery to follow the processes of this restoration through to completion.